How to choose the right crane based on lifting capacity and height?
Determine the weight of the heaviest structural elements (panels, blocks) to be lifted and choose a crane with a slight margin in lifting capacity.
The crane's height must be sufficient for the hook to deliver materials to the top floor of the future building, accounting for the height of the load and slings.
It is crucial to check the load chart: what weight the crane can lift not just near the tower, but at the farthest point of the site.
Ready to start a new project? Contact our specialists for detailed consultation and cost calculation.
Contact us